Clock / UK data centres · updated 26 October 2026

Data centres in the South East: electricity use and sites

In 2024, data centres in the South East used 1,785 GWh (1.79 TWh) of electricity from the grid. That was 5.1% of all grid electricity consumed in the area src.

1,785GWh used by data centres, 2024 src
5.1%of the area's grid electricity, 2024 src
68data centres with matched meters, 2024 src
+57%change in use, 2020 to 2024 src

The trend, 2020 to 2024

1,13920203.2% of area1,26020213.5% of area1,42420224.1% of area1,56820234.5% of area1,78520245.1% of area

Gigawatt-hours of grid electricity used by data centres each year, and that use as a share of all grid electricity in the South East. Source: DESNZ src.

YearData centresGWhShare of area electricity
2020591,1393.2%
2021611,2603.5%
2022651,4244.1%
2023681,5684.5%
2024681,7855.1%

Use went from 1,139 GWh in 2020 to 1,785 GWh in 2024, up 57%, while the share of local electricity moved from 3.2% to 5.1%. DESNZ counted 59 operational data centres here in 2020 and 68 in 2024 src. Across Great Britain, data centre use rose 41% over the same period.

How the South East ranks

The South East used 40.0% of all data centre electricity in Great Britain in 2024 (1,785 of 4,460 GWh). Among the 8 areas DESNZ splits Great Britain into, it ranks 1st for total data centre electricity and 2nd for the share of local electricity going to data centres src. For comparison, data centres used 1.8% of grid electricity across Great Britain as a whole.

  1. South East: 1,785 GWh, 5.1% of local electricity
  2. Outer London: 1,169 GWh, 7.1% of local electricity
  3. Inner London: 489 GWh, 2.7% of local electricity
  4. South West and Wales: 372 GWh, 1.1% of local electricity
  5. East of England: 339 GWh, 1.4% of local electricity
  6. The North: 166 GWh, 0.3% of local electricity
  7. The Midlands: 87 GWh, 0.2% of local electricity
  8. Scotland: 51 GWh, 0.2% of local electricity

What that much electricity means

1,785 GWh is about the yearly electricity of 714,000 typical UK homes, at Ofgem's 2,500 kWh a year for a medium home src. DESNZ's two figures also imply that all grid users in the South East used about 34,851 GWh in 2024 (data centre use ÷ its share).

Derived: homes = data centre kWh ÷ 2,500 kWh, rounded to 3 significant figures. Implied area total = data centre GWh ÷ share. Share of GB = area GWh ÷ GB data centre GWh.

Inside the South East

DESNZ splits this area further src:

Mapped data centre sites

OpenStreetMap and Wikidata have 74 data centre sites mapped inside the South East's boundary src src, 69 of them with a name: 4D Data Centers - Gatwick, AWS Bracknell Data Centre, AWS Didcot Data Centre, Ark Data Centres, Ark Data Centres - Longcross Park, Asanti - Farnborough, Asanti - Reading, Bank Of America, CSquare London LHR3, CXD Infrastructure Solutions, CapitaLand Ascendas REIT, Centrilogic, China Mobile Slough, CryrusOne LON4, CryrusOne LON5, CustodianDC DA2, CustodianDC Maidstone, CyrusOne LON3, Datum Farnborough Data Centre, Digital Realty LGW14, Digital Realty LGW15, Digital Realty LGW16, Digital Realty LHR26, EXA Infrastructure - St James House, Elasticity Slough, Equinix LD10, Equinix LD11x, Equinix LD5, Equinix LD6, Equinix LD7, Global Technical Realty London GB One, Goldman Sachs, Gravity Edge LDN1, IBM Horsham, Iron Mountain LON-3, Iron Mountain London LON-1, Keppel Data Centres (Vodafone) - London, Lumen, Microsoft Thames Valley Park Data Centre, NTT Slough 2 and 29 more.

Sites placed by point-in-polygon against ONS local authority boundaries src. Community-mapped sites aren't the same list as DESNZ's count (which only includes colocation and hyperscale data centres with matched meters), so the two numbers differ. OpenStreetMap snapshot: 21 September 2026. Missing one? Add it to OpenStreetMap. See them on the map.

AI Growth Zones

All UK AI Growth Zones →

Announced projects

  1. Culham, Oxfordshire becomes the UK's first AI Growth Zone planned src
  2. CloudHQ to develop a £1.9bn hyperscale data centre campus in Didcot, Oxfordshire planned src

Full tracker →

Nearby and related areas

All UK areas, sortable →

Sources

  1. DESNZ, Data centre electricity consumption in Great Britain, 2020 to 2024: data tables (Excel) (Tables 1–3; Official Statistics in Development, published 30 June 2026)
  2. DESNZ, Energy Trends June 2026 special feature: Data centre electricity consumption in Great Britain, 2020 to 2024
  3. Ofgem, Typical domestic consumption values: decision (2026)
  4. OpenStreetMap contributors, features tagged telecom=data_center or building=data_center (ODbL; planet snapshot 21 Sep 2026, via QLever) (ODbL) and Wikidata (CC0); boundaries: ONS (OGL)

DESNZ's figures cover colocation, managed hosting and hyperscale data centres whose electricity meters could be matched; they exclude enterprise (in-house) data centres and on-site generation, so they're a floor, not a total. Some areas are grouped by DESNZ for disclosure reasons. Download this page's data: local.json.